Winter 2014
Written by Rob Moody   
Sunday, 23 November 2014 23:01

December Faversham Meeting: Geoff won the Christmas Quiz, despite his having dined with us before hand; usually a recipe for becoming comatose.  Wide ranging Questions from railway modelling to the origins of Broad Street station were set by Roger and caused lively banter amongst those 16 of us armed with paper and pens. John P broke out mince pies and bubbly drinks as we milled around discussing plans of Edington’s buildings were spread before us by John Minter, or looking at the PD&SWJR tank loco Ross had brought along. Later, calling out season’s greetings, we headed off under chilly stars and Faversham’s Christmas lights.  [photo: Ross S]

Frank Poulton  - We heard the sad news of Frank Poulton’s death on 25th November. Frank had been a stalwart supporter for many years, and was always pleased to share his considerable skills to the great benefit of those of us struggling with soldering irons and coupling rods. His own models were an inspiration, and he continued to experiment with new ideas. His ambition for his engines to travel slower than anyone else’s around the barn circuit was demonstrated by his GWR 0-4-0t dock tank hauling a massive goods train at an snail’s pace, based on his principle of maximum weight and minimum friction. He built an immaculate LSWR radial tank and SECR D Class. His mischievous sense of humour cheered many a lunchtime session and Faversham meeting. His contribution to EK0GG has been and remains highly valued. Our condolences go to his wife and family. Notes by David Grimwood

November's Faversham Meeting: We gathered round in awe as Barry, our speaker, spread a splendid selection of his model trees before us. A real “Master Class” with swift wire twisting producing trunk and branches.  He then demonstrated how to add more branches and explained how to sculpt bark and add foliage.  Barry very generously donated several of his trees to our Edington layout project.  A well attended and enjoyable meeting.  [photo: Ross S]

Last Updated on Friday, 20 February 2015 19:22
 
Autumn 2014
Written by Rob Moody   
Saturday, 23 August 2014 13:25

Autumn 2014 - Mid-week sessions

David G and John P have organised Wednesday sessions when we can assist with construction of Edington, run stock and model, or drop by for a chat.  October 22nd was cool but sunny so we lunched outside in our jackets.  Roger continued his battle with “Sale Items”, before we turned our attention manhandling tables and workbenches to what we hope are final positions. Prussian blue trains trundled by as Barry soldered on Edington, while David Hopkins cut rails between sections. Ross placed the finished lamp hut, complete with rusty "No Smoking" notice, on the layout beside various mock-ups of buildings. On the 29th out of the mizzle, following dictated directions, came Richard and Mike, finding us ready with tea.  Up in the loft baseboard bracing was checked as a red tank loco pottering round.  Soon Richard was running-in a 08 diesel.  Nine of us lunched with LMS trains on the circuit.  Sector plates were eased and buildings planned, plus sorting and tidying continuing.  We sposhed into the gloom around 4 o’clock.

On a chilly November 5th landscaping began on Edington, with polystyrene panels beginning to build up the heights of the Somerset levels…  Up at the SEG0G Show Maurice and Colin S helped Roger with the G0G display and sales.  Continental freights hurried their Interfrigo vans around the layout on the final session: SR electric locos in parallel with a D65er.  Outside thrushes raided the hedge for berries under as crystal clear skies. Kettles on, we finished jobs: Jim fitting contoured edges to Edington, Paul measuring signal locations, and Roger planning the signal box.  David G and Barry adding landform, with John P working on platform edging.  David 2 joined Colin on Nailbourne before the covers came out and we put the layouts into hibernation mode ready for spring.

October 25th - Town Meeting

Twelve of us watched, and some were brave enough to try using “Templot” on the projector screen in the Fleur De Lis Hall, as David G developed track into curves and points. Afterwards we had film of track laying on the LMS. With internet connection we showed our website gallery to those without computer access. After tea and Australian Beyer-Garretts, it was a good look at film and photos of Edington Junction.

October 4th/5th Making & Running:  EK0GG manfully picnicked in the garden until a squall sent leaves tumbling and brought splashes of rain.   We had a dozen model making and running trains.               Soon Maurice’s MR freight had half a dozen colourful salt vans was on the circuit.  Colin C got himself up to the loft, after a breather, and a little later his son, Simon, hurried in out of the rain.  Soon they were discussing Terrier building with Barry.  Colin S and Ross were sploshing filler and glue; greenery spreading by Nailbourne’s tunnel.  Stuart joined them later on, when they were wallpapering the sky…    David 2 cleared up the kitchen, then sketched out electric feeds with David G.  Paul was engrossed in pointwork when Alastair looked in.  David 3 eventually got through the road hold-ups to join them on Edington.  At the Folkestone Show on Sunday, John P found Roger and Geoff enjoying a sunny view over the Channel on the G0G stand.

20th September 2014 - At the Layouts

20th September - At the Layouts: On a misty day we were out in force, lunch brightened by home-made cake.  We caught up with news of Telford.  The fourteen of us studied photos of Edington, plus building plans as we discussed valancing. Around us a long rake of Midland parcel vans ran with a GWR steam railcar on the opposite track. Battle was done with recalcitrant point motors and blades for trap points.  In the workshop we mused over the sector table while strengthening the floor above.  Four Lima Class 33s chuntered along later amongst other trains.  Roger will be representing the Guild and us at the Folkestone Model Railway Show – 4th & 5th October.

30th August 2014  -  Running and layout construction

A crowd around Edington were using a mock-up house to gain an idea of space available, but the fitting of points and their motors occupied most time.  The control panel was being planned, while the sector plate was being pared down.  A M&StL Railroad diesel and boxcars beat Midland trains onto the circuit, to be followed by a Terrier and a saddle tank with a pair of brake vans.  Later a diminutive diesel mechanical took to the rails.  Alastair, helping sort a derailment on the lifting section, wondered if we should call it the Tay Bridge…  Paul and Roger produced a score of almost finished waggons from the boxes they were sorting through.  The Nailbourne crew were being creative, adding to the over-bridge with fingers dipped into polyfila and, installing a telephone kiosk.

Our new sweatshirt design will be available to inspect and order at future layout sessions and meetings. The Group has paid for the setting up of the embroidery, so keeping the cost reasonable for members.

Last Updated on Sunday, 16 November 2014 19:45
 
Summer 2014
Written by Rob Moody   
Sunday, 04 May 2014 15:44

August 16th At the layouts

Despite living there for most of the week David G and John P early.  They certainly had a lot to show those who hadn’t visited for their mid-week sessions: track now extended to Edington’s limits, some of it painted; buffer stops had sprouted; several points were motored and more being prepared; while below - the bed of the first sector plate was ready.  The roof, well our end of it, had kept them dry during Monday’s storm, but water dripped through the end wall, pausing awhile in the plastic tub – the one with the hole…

We had our traditional outside lunch and tea; catching up on news.  David and Stuart ran saddle tanks.  Ross was adding to Edington’s buffer stops.  Stuart checked his glazed footbridge on Nailbourne as Colin laid pavement.  Cavedale’s coal merchant now has fencing thanks to Roger.

August 2nd Layout session

We had a dozen turn up to witness the first powered loco on Edington.  It picked its way along the little section of complete track as construction proceeded around it.  We’d lunched and taken our tea-break in the garden.  On the circuits trains were tested and a station building made a first brief appearance.  Cavedale had a couple of push-rods fitted to points, while Nailbourne’s bridge was positioned and blue sky dawned behind the coal yard.  We are having several mid-week sessions this summer, so do check our dates.

July 19th Layout

With fallen oaks and split ash trees in the lanes eleven of us arrived at the layout to find that both it and Alastair had weathered the storm.  It was hot outside at lunch and sweltering in our loft, so it was open the windows and look out the fan.  The track builders and electricians, hard at work, discussed having some midweek sessions.  Out on the circuits Maurice was cleaning and soldering to get trains running.  Ross ran a saddle tank with a Dapol brake van while Ron and John M tried out locos they are building.  John P and David H told of their friendly reception at the Pett Show when taking our sales stand there.

July 10th Layout: Working Party

Grimy is the only word to describe John P and myself after cleaning up and re-fixing the blue plastic ceiling – very grimy in John’s case, as he spent most time atop the ladder. We studied photos of Edington with Barry and David G during our break.  They’d been working as far away from us as possible, at the clean end of the loft, assembling Edington’s first point.  Despite a major sweep, we’ll all need to vacuum track and polish rails before running next time.

July 5th Layout: Notes from Roger Harmer

Eleven of us met at the barn.  David G and John’s primary task was track laying on Edington Junction where a significant amount was done.  Barry was in the workshop grinding rails to make the point blades.  Jim and David H measured up for the fiddle yard; Jim also prepared for work on the fire escape.  Much fun was had moving Edington along three feet; we had exactly enough people to do it without disaster.  Paul replaced the dodgy floor panel by the controllers before working on uncoupling magnets.  Colin got the Nailbourne coal yard looking really scruffy before moving on to the loco stabling point. Maurice, meanwhile, replaced a point on the mainline to give a smoother run into the loop.  While we (well, some) were slaving, Geoff ran a modified Lima 4F, an 04 diesel shunter and LMS 10000 in the black and silver livery.  Paul ran his 14XX and Maurice a couple of red engines (of course) including a "Crimson Rambler" - Midland Compound.

O gauge stuff was loaded into David H's car as he and John P are to take it to the Pett show on Sunday 13 July to sell.

June 21st Layout: Exhibition layout progress, modelling & running

The second rail was laid on one of Edington’s sidings and a finger powered wagon sent speeding along.   David G had been impressed by the team’s progress.  Sleepers, chairs and rail continued to be produced.   We had lunched first; sitting in the hot sun catching up with the news.  Out on the circuit was Tenterden Museum’s refurbished Austerity tank and a SR W tank was at the head of SR parcels vans.  Over at Nailbourne there was preparatory work for loco sidings.  With an erstwhile member visiting, we had twelve at the tea table looking at kits, tools and parts - all for sale.  [More photos in our gallery]

June 7th Layout: Running and Construction - notes by John Plumpton

I arrived at the layout to find Ron already there, and with Barry on my tail. We awaited the arrival of others, boiled up the kettle and got our chairs out into the sun for lunch.

 

Those with nimble fingers started assembling the rails and chairs with others glueing sleepers to the baseboard template, whilst I continued attaching rail/chairs to the sleepers.  Maurice entertained us by running his locos around the test tracks, whilst Colin was building coal staithes for Nailbourne yard.  Others arrived from the show at Faversham.  We unloaded Roger’s car and sorted through the sale items spread across our picnic table - we managed to find space to have our afternoon tea. An interesting afternoon.  [photo: Barry's SR W class -Ross S]

May 17th Layout: Running and Construction

With two fettled controllers the circuits all ran well.  A saddle tank, with added nameplates (virtually straight), was first away with a mixed train, while Ron tried out the chassis of his GNR triplets on the other line.    Barry ran his C class then a “Merchant Navy” who’s motor is suspect.  A 2P on maroon coaches followed, but the twelve wheeler proved prone to buffer lock.  A slow and steady Fowler DM joined in.  Meanwhile John kept the “Edington” team happy and productive as they positioned sleepers, slid chairs onto rail then carefully applied solvent.  To rest their fingers, they were allowed out for tea and biscuits in the sun.  A dozen of us, and a dog, basked and chatted.

May 11th: Kent & East Sussex Railway - Ross organised for six members to visit the Carriage and Wagon works to see restorations, including the LNWR inspection saloon, a 1860s District Railway coach and the SER Edith Cavell van, used to repatriate her and other victims of WW1, plus a restored Maunsell boat train "nondescript" carriage.  They met at the museum, noting models made by Peter Hingley and Richard, before the curator led a tour of the station site.  Next it was a ploughman's lunch as they rode to Bodiam behind USA tank No 65.  For the return they sat in the Birdcage coach. [photo- Ross S]

May 10th:Temple Ewell Show - Nine of our people attended: Geoff Roberts, organiser, with a diorama; Roger selling items for our funds while Maurice kept an eye on his layout; Mike Perry with Tar Works; and Richard scratch building wagons.  (Others attended the Reading Larger Scale Meeting.)

May 3rd At the layouts

The sleepers were down and the air heady with solvent as the chairs were slid along the first rail – Edington Junction was on its way.  David G and John talked us through the processes prior to starting.  Ron patiently threaded chairs for successive teams of gangers.  Outside, Jim was preparing baseboard supports with Paul’s help.  We were out in the garden for lunch when a Dingham coupler weight went missing!  It was heads down and fetch a magnet on a rod…  Ross worked on Nailbourne’s coal yard as Barnfield’s baseboard was improved and shelves added.  David H’s improved controller was doing its stuff; Roger getting his R1 rolling with coal wagons and Barry following with H tank 31550.  I began to run-in a Hudswell-Clarke with a SR road van in tow, before Ron tried out a GE 2-4-0.  Colin’s plywood 2 BIL whizzed around in parallel with Barry’s “Sir Blamor de Ganis”.  Having built up his strength with broken chocolate biscuits at tea break, Colin heaved a Class 47 onto the track to end the running session.   [Photos by Rob M & Ross S]


 

Last Updated on Tuesday, 19 August 2014 19:28
 
«StartPrev12345678910NextEnd»

Page 5 of 13